Land Domain Case Study

The client needed to understand and capture any support risks that may threaten ISS delivery when merging ten individual support contracts. As this spanned ten different systems, hosted on multiple platforms, a phased approach was decided upon in order to provide an experienced Through Life Support peer review.
The Forgotten Few

Within this blog we discuss the reason we look to utilise the forgotten few.
Pre-Concept Advice & Guidance

During pre-concept it is unlikely that an ILS/IPS resource will have been assigned to the project, but we can help!
Air Domain Case Study

The client needed an In-Service Support (ISS) Basis of Estimate (BoE) & Work Breakdown Structure (WBS) and supporting WBS Dictionary that detailed specific tasks / deliverables which integrated with a Transition to Support (TtS) WBS and an Engineering WBS, which were currently in development.
The Story Behind TBES

Within this blog we discuss the inspiration behind the formation of TBES.